Our videos - learn more about the Depenbrock Bau Group
New construction of the outer main at the Papenburg sea lock
Heavy earthworks in Weilerbach
Depenbrock was awarded the contract for earthworks and canalisation work on the most financially costly construction project currently being carried out in the Palatinate. Near Weilerbach in the district of Kaiserslautern, civil engineering work began in May 2015 with the commissioned earthworks. The actual clinic construction for the new US hospital is scheduled to begin in 2017.
A 90-tonne excavator is in operation as well as 4 other large excavators, three crawlers, 10 dumpers, rollers and single-drum compactors and several tractors. Around 470,000 cubic metres of soil will be shifted to compensate for the differences in height.
Full video: Expansion of A33 gap closure Osnabrück and Bielefeld
Commented video about the complete construction phase of the gap closure of the motorway A33 between Osnabrück and Bielefeld. Among other things, up to 5,000 m3 of soil per day, up to 10 crawler excavators, 3 crawlers and 50 trucks and tractor-dumpers were used simultaneously on the construction site.
Model of the indoor swimming pool in Dormagen with recording of virtual reality glasses: superimposition of the structural analysis and the TGA model.
New construction of the Albrecht Dürer School with triple sports hall